Charles Air Fuel Farm Project

Everett, WA

ABOUT THE PROJECT

Shinn Mechanical was the prime mechanical contractor on this project which involved the Furnish & installation of (2) underground jet fuel tanks with fill and vent assemblies, (2) above ground fueling cabinets and all associated fuel piping, valves and support assemblies. All interconnecting piping was fabricated and installed by Shinn Mechanical. Each weld joint was inspected and radiograph tested per ASME B31.3.

Owner: Charles Air, LLC
General Contractor: Lease Crutcher Lewis