Mt Si High School

ABOUT THE PROJECT

Snoqualmie Valley School District passed a 244 million bond for this new school in 2015. Construction began in 2017 and will be completed in 2021. The School is designed for 2,300 students serving grade 9 thru 12 and is 253,000 square feet in size. Unique features about the school include:

  • That it is built in a flood plain and to overcome this the entire school is elevated with parking below.
  • The soil that the school is built on is poor so stone columns where bored into the ground to provide a suitable foundation.
  • This school will have all the amities including new gyms, multiple science labs, a performing arts center, unique learning areas, and several kitchens.

Shinn Mechanical is the prime mechanical contractor on this project. Scope includes HVAC, plumbing, mechanical piping, insulation, etc. Project was delivered utilizing BIM with total station layout prior to concrete pours for in-slab hangers and sleeves.

Owner: Snoqualmie Valley School District
General Contractor: Spee West