UW Tower Chiller Replacement

ABOUT THE PROJECT

Replaced two existing chillers located on 23rd floor of UW Tower. Removed existing equipment, chillers, structure frames, piping, controls, etc. and replaced with new. Scope included crane, roofing replacement, concrete work, startup, controls, and commissioning. Extensive coordination for with UW, Sound Transit, and local business for street closure and crane work.
Project fee was negotiated and developed during design process. This was a design assist project as a team effort from the beginning of project.

Owner: University of WA
General Contractor: Trane Commercial Systems