Lynnwood Waste Water Treatment Plant

ABOUT THE PROJECT

Shinn Mechanical was the prime contractor (general and mechanical) for this project. Project included replacing existing centrifuges with a new screw press system for dewatering solids. Separating the non-potable water system into two zones and installation of new pump skid packages. Demolition of existing thickened sludge tank and restoration of structure. As well as installation of new Clarifier covers.

Owner: City of Lynnwood
General Contractor: Shinn Mechanical/Trane